1
/
of
13
Industrial Orbital TIG Welding Machine – Automatic Water-Cooled Tube & Pipe Welder
Industrial Orbital TIG Welding Machine – Automatic Water-Cooled Tube & Pipe Welder
Regular price
$9,194.95 USD
Regular price
$1,574.95 USD
Sale price
$9,194.95 USD
Taxes included.
Shipping calculated at checkout.
Low stock: 5 left
The FXT20 Automatic Orbital TIG Pipe Welding System is a high-performance digital welding solution designed for precision orbital welding of stainless steel, carbon steel, titanium, and other alloy tubing. Featuring a programmable touchscreen controller, closed orbital welding head compatibility, and intelligent parameter management, it delivers consistent, high-quality welds for critical applications in the Oil & Gas, pharmaceutical, semiconductor, food processing, and industrial manufacturing sectors.
Couldn't load pickup availability
Product features
Product features
- Digital programmable orbital TIG welding power source
Compatible with closed orbital welding heads (C5–C170)
Welds pipe diameters from 3.175 mm to 165.2 mm
Suitable for wall thicknesses from 0.5 mm to 3.0 mm
10-inch color touchscreen with intuitive user interface
Automatic and manual welding parameter programming
Stores up to 200 welding procedures
PLC-controlled system for precise process management
Output current range: 5–200 A DC
Water-cooled welding system for continuous operation
Supports argon shielding gas
Built-in safety protections including overload, over-voltage, leakage, arc failure, and tungsten short-circuit detection
Compact integrated design for workshop and field applications
Ideal for high-purity and critical process piping
Designed for stainless steel, carbon steel, titanium alloy, and similar materials
Suitable for Oil & Gas, petrochemical, pharmaceutical, semiconductor, food & beverage, and process piping industries
Materials and care
Materials and care
Designed for welding stainless steel, carbon steel, titanium alloy, and compatible metal tubing
Operate using clean argon shielding gas for optimal weld quality
Ensure the water-cooling system is properly filled and maintained before operation
Regularly inspect the welding head, tungsten electrode, cables, and cooling lines for wear
Clean the equipment after use to remove dust and metal particles
Store in a clean, dry environment when not in operation
Follow recommended maintenance schedules to ensure long-term performance and welding accuracy
Share
